Free Quotes: 1-800-221-3332 • Anchorage, AK • Delaware, DE • Oklahoma City, OK • Houston, TX • Nashville, TN

Recent Workx:

IFT is known for its data center experience and has completed thousands of projects, over 30+ years, including: Pipe Freezing, Line Stopping, Hot Tapping, and Valve Replacements. Below are a few recent projects.
 

Thank you letter from the City Manager, James W. PinkertonCity of Kingston, Tennessee
City broke off a 2" air relief valve on a 16" ductile sewage pipeline with 45psi. Before the valve could be replaced we had to rush out and complete a 16" linestop. The linestop was successful with a 100% plug. On the left is the thank you letter from the City Manager, James W. Pinkerton
 

Thank you letter from the Vice President/Director Larry LarsonBank of America, San Francisco, CA
The Bank of America data center in San Francisco experienced a major emergency on their 16" and 12" chilled water main system for all their super computers. With millions of dollars at stake the pressure was on. IFT completed 16" and 12" emergency linestops and helped change out the broken valves; repairing their systems without issue. This situation was so critical that Bank of America flew out all our equipment on their company jets from the Temecula Airport.


National Institutes of Health, Bethesda, Maryland

I just wanted to take a minute to thank and commend you on your team selection and the gentleman who performed the work out here at NIH for us last week. Tom and his partner were on time, and performed their work with the utmost professionalism. This is a very high profile project for my firm and for NIH and your technicians made us look very good and in fact helped us solve a big testing problem.
 
Again, thank you very much for helping us get this work done.
Michael McReady
JCM Associates, Inc.

City of Yuma, AZ
We were impressed with Jason, he represented your company very well on the job in Yuma. We’ve had vendors/workers in the past who show up, fumble around and are not totally familiar with their equipment. Not the case with Jason, he was professional, prepared and jumped right in and got started.
 
Thanks, Craig
Craig Hochheimer

Utility Systems Supervisor Oakridge National Laboratories – Department of Defense
Oakridge, TN
Optimech, LLC
Many 8”, 10” and 12” Freezes and Linestops on the Kraken & Cray Super computers  
 
Dulles International Airport
Virginia
DMG Consultants / Turner Construction
4 - 8” Simultaneous Freezes for Airport computers
 
San Diego International Airport
San Diego, CA
Pacific Rim Mechanical
8” Freezes and linestops on the Airport computers
 
Smithsonian Air & Space Museum
Washington, DC
Calvert Mechanical
14” Freeze on Chilled water
 
NSA Computer Data Center
Washington, DC
Calvert Jones Co. Inc.
Critical Data Pipe Freezing
 
National Research Lab
Washington, DC
Critical copper pipe freezing
 
AT&T  Central Computer & Billing Center
San Diego, CA         
Contractor: R.J.Duam Const.
Various line stopping, hot tapping and Pipe freezing on Condensate water
 
Dept of Homeland Security, Immigration & Customs
Los Angeles, CA
D. Burke Mechanical 
4 – 16” Simultaneous Freezes on Chilled water
 
Bank of America Data Center
Brea, CA
Various line stopping and hot tapping on data chilled water
 
Bank of America Data Center
Louisville, KY                     
Comstock Brothers
Various line stopping and hot tapping on data chilled water
 
Fairchild Semiconductor, Inc
Mountain Top, PA
6” Critical Data Freezes Glycol
 
Pfizer Corporation CB-2
San Diego, CA
Pacific Rim Mechanical
Many 14”, 12” and 8” Critical Freezes and linestop
 
Children’s National Hospital
Washington DC
Dominion Mechanical
Various Critical Freezes
 
Department of Justice - Federal Records Data Storage
Complete Building Services
Data Center Pipe Freezing
 
NIST Computer Data Center
Gaithersburg, MD
Calvert Jones Co. Inc.
Critical Data Pipe Freezing
 
Washington & Lee University
Lexington, VA
K. Jellstrom & Lee
Heating System Freezes
 
Tennessee Valley Authority

Raccoon Mountain, TN
Critical System Freezing

Smithsonian Air & Space Museum,
Washington, DC
14” Chilled water

Dept of Homeland Security, Immigration & Customs,
Los Angeles, CA
16” – Simultaneous Chilled water (4) Freezes

Cal Poly
San Luis Obispo, CA
4” – Heating Hot water Freezes

ESS Chill Water Systems
Mexicali, B.C. Mexico
8” – Heating Hot water Freezes

Salt Lake Mormon Tabernacle
Salt Lake City, Utah
Various Freezes – Heating Hot water National Institute of Standards and Technology - NIST
Washington, DC
Pipe Freezing of main data computer cooling system.
Contractor – Calvert Jones

US - Dept. of Justice - Office of Information
Rockville, MD
PipeFreezing of US information storage computer’s cooling system.
Contractor – Complete Building Services

Campbell Soup Company
Camden, NJ
PipeFreezing of corporate data cooling system.
Contractor – FMA Construction

Hershey Company – Y & S Candies - Swizzler
Lancaster, PA
PipeFreezing of Reactor Effluent system.
Contractor – TAH Construction

Fairchild Semiconductor, Inc
Mountain Top, PA
PipeFreezing of data cooling system.
Performed directly for company

City of Rowland Arkansas
Littlerock, AR
1 – Emergency 42” linestop on industrial water supply
Contractor – Harper Construction, AR

City of Lynchburg, VA
1 – 30” linestop on Sewage Pump-station indoors 5 stories below ground
Contractor – Hydro Tap, VA

Tennessee American Water
Chattanooga, TN
1 – 30” High Pressure linestop on water supply
Contractor – East Tennessee Grading

 And many more...

Service 1

Wall Tapping

We can hot tap Tanks, Vessels, Conduite, Walls and Concrete Cylinders.

Read more
Service 2

Hot Tapping & Line Stopping

Hot taps, Line stops on all pipe types up to 72inch pipeline nationwide.

Read more
Service 3

Valve Replacement

Valve replacment on all size valves live in the system with little to no downtime.

Read more

40+ Years of Wall Taps, Leadership and Innovation. Proven to be one of America’s most Advanced Municipal & Commercial Wall Tapping Service Providers.

Contact us Today!

Testimonials

"We were impressed with Jason, he represented your company very well on the job in Yuma. We’ve had vendors/workers in the past who show up, fumble around and are not totally familiar with their equipment. Not the case with Jason, he was professional, prepared and jumped right in and got started."

- Craig Hochheimer,
City of Yuma, AZ

"I just wanted to take a minute to thank and commend you on your team selection and the gentleman who performed the work out here at NIH for us last week. Tom and his partner were on time, and performed their work with the utmost professionalism. This is a very high profile project for my firm and for NIH and your technicians made us look very good and in fact helped us solve a big testing problem."

- Michael McReady,
JCM Associates, Inc.

"City broke off a 2" air relief valve on a 16" ductile sewage pipeline with 45psi. Before the valve could be replaced we had to rush out and complete a 16" linestop. The linestop was successful with a 100% plug. On the left is the thank you letter from the City ."

- James W. Pinkerton,
Manager, City of Kingston, Tennessee

Get A Free Quote

Free Hottap Linestop Bypass Quote FormFree Insert Valve QuoteFree Pipe Freeze Quote FormWall Taps Quote FormWall Taps Quote Form

Our Services

Hot Tapping Services
Call 1-800-221-3332 Toll Free
Line Plugging Services
Call 1-800-221-3332 Toll Free
Pipe Freeze Plug Services
Call 1-800-221-3332 Toll Free
Valve Installation Replacement Services
Call 1-800-221-3332 Toll Free
Pipeline By-passing Services
Call 1-800-221-3332 Toll Free
Wall Tapping Services
Call 1-800-221-3332 Toll Free